Stormwater Drainage for the City of Melville with CIVCON

The City of Melville awarded the contract for the Waratah Avenue Rehabilitation Works to our clients, Civcon Civil and Project Management Pty Ltd on 26 April 2022.

The scope of work included the following:

 1.         to resurface the roadway;

2.         repave all sections of damaged paving;

3.         construct a loading bay situated outside

            Dalkeith Hall;

4.         no raised plateaus be constructed;

5.         repair all kerbing that is damaged;

6.         installation of tree wells and trees within

            a new median strip.

Glenview Civil worked with Civcon in the upgrade of the older and smaller brick drainage pits, to full size soak wells.  The inclusion of these upgrade works would provide significant additional stormwater storage and infiltration capacity within Waratah Avenue and assist with the wider drainage issues in the catchment.